01
Bid control
Confirm bidder, revision, received time, addenda acknowledged, bid bond if required, and proposal validity.
General contractors who need to compare subcontractor bids that never arrive in the same format.
Direct answer
General contractors should compare subcontractor bids against the same trade scope, not only the bottom-line totals. First preserve each bid as submitted; then map inclusions, exclusions, allowances, alternates, schedule, qualifications, and commercial terms into common rows. Resolve material differences with written clarifications, show any leveling adjustment separately, and base the award recommendation on complete evaluated scope, price, capacity, and risk.
01
Confirm bidder, revision, received time, addenda acknowledged, bid bond if required, and proposal validity.
02
Compare every bidder to the same drawings, specifications, scope sheet, and trade-boundary assumptions.
03
Separate base price, alternates, allowances, unit rates, taxes, bonds, escalation, and payment qualifications.
04
Record schedule compliance, manpower, lead times, safety or qualification requirements, and unresolved exceptions.
05
Attach clarifications and state the evaluated total and remaining conditions before award.
Official guide
Procore — construction bid levelingBid leveling as a scope-based, side-by-side comparison used to expose missing work, exclusions, and price differences before award.
Official guide
Procore — bid evaluation and levelingA repeatable bid-evaluation process that compares bidder information against the applicable scope and records award criteria beyond total price.
Bid evaluation criteria, disclosure, negotiation, and award procedures depend on the owner, contract, and whether procurement is public or private. Apply the rules governing the specific solicitation.
Published July 21, 2026 · Sources verified August 4, 2026 · Research methodology
A GC collecting five bids for the same scope is really collecting five different scopes with five different price tags. Reconciling them by hand means copying numbers into a master sheet and hoping nothing got missed along the way.
“Get 3 quotes per trade (subs and suppliers), Compare them side-by-side, Build a clean master estimate, Add overhead + profit correctly.”
“You send out a clean, structured Excel file. Three bidders return it with deleted rows, rearranged columns, and weird formulas you didn't add.”
PDF, Excel, a locked spreadsheet from a sub who ignored your template — Bid Leveller reads what you paste and pulls the line items out itself.
Bids get normalized onto a common scope basis, so a lower number that quietly excludes demo isn't sitting next to one that includes it without a flag.
The comparison surfaces exclusions and gaps by bidder, so you know what's missing before award — not after the first change order.
Free, runs in your browser, no signup.
Bid LevellerFree
Paste sub bids in any format. Get a normalized comparison and what each bidder quietly left out.