Cost codes are what make job costing possible at all. Without them, every expense on a job is just a line in an accounting system with no connection to the estimate that predicted it. With them, 'concrete labor' or 'electrical rough-in' means the same thing on every job, so this project's actuals can be compared to the estimate — and to the last ten projects like it.
Most small shops either don't have a cost code structure or have one that doesn't match how they actually estimate, which means the two systems — estimating and job costing — never talk to each other.
Example
A GC codes every timesheet entry and material receipt to a standard list: 03-100 for concrete formwork, 16-050 for electrical rough-in, and so on. At any point, they can pull actual cost against estimate for 03-100 across every job that used it.
Related terms
Next step
Where this shows up in Datumel:
Job-Costing Workbook InstallFrom $6,000 one-time
A configured job-costing workbook in your own Sheets or Airtable: cost codes, estimate-versus-actual, WIP, and over/under billing, with training to run it.