Construction addendum review for specialty subs

Specialty subs who need to know exactly what changed in an addendum before re-pricing their scope.

A sub re-pricing scope after an addendum doesn't have time to compare the new drawings against the old ones page by page — and a missed revision means re-quoting the wrong scope, which shows up as a margin problem after award, not before.

I got sloppy and didn't go all the way through the 116 page Addendum and of course it was buried near the end. Our scope rarely changes from original prints issued but this one time it did majorly!!!

a specialty sub on r/estimators

I feel like we are bleeding cash on 'favors' that never get billed.

a specialty sub on r/Construction

How it works

01

Paste the addendum

The full document, as issued.

02

Get every change catalogued against the original scope

So it's clear what actually changed in your trade, not just that something did.

03

Re-quote only what actually changed

Instead of re-bidding the whole scope from scratch or missing a revision entirely.

Next step

Free, runs in your browser, no signup.

Addendum DigestFree

Paste the addendum. Every change catalogued (scope, cost, schedule, document revisions) plus what to re-quote.

Open →