T&M billing shows up when the scope can't be nailed down ahead of time — emergency repairs, unknown existing conditions, or small add-on work that isn't worth writing a full change order for. The contractor tracks hours and materials as the work happens and bills against that record, usually with a markup on materials and a burdened labor rate.
The tradeoff is that T&M only works if the documentation is airtight. Without a signed daily ticket, the GC or owner has no way to verify hours worked or materials used, and the burden of proof sits with whoever's trying to collect.
Example
A plumbing sub gets a call to fix a burst pipe discovered behind drywall on an otherwise fixed-price remodel. There's no line item for it in the contract, so the work runs T&M: two hours of labor, a coupling and section of pipe, signed off by the site super on a daily ticket before the sub leaves.
Where this goes wrong on real jobs
Undocumented T&M work is the most common way field crews give away margin for free.
“Lost ~$4k this month on unbilled T&M work.”