Electrical scope disputes usually trace back to ambiguous language nobody caught before the bid went out — 'run wire' meaning different things to different people once the walls are open. In a slow bid market, an electrical sub can't afford to eat a scope gap that a second read would have caught.
“My contract says they will install 2 new wall outlets at wall locations and also 'run wire for an outlet on the island.' The contractor is now saying running the wire doesn't include actually installing the outlet.”
“Bid day, electrician quotes were coming in astronomically high and sent the project over $50+ million range. We pulled the plug after 3 months of work. Stung like a bitch, day before the bid too.”
How it works
Paste the spec section or scope language in question
The exact wording that's ambiguous — not a general description of the job.
Get flagged ambiguity and commonly missed electrical scope
Boundary items like fixture-versus-rough-in, and code-required items that aren't itemized.
Quote it explicitly, before it's a dispute
Write the scope so 'run wire' and 'install' aren't left open to interpretation.
Next step
Free, runs in your browser, no signup.
Scope Gap ScannerFree
Paste plan notes or spec sections. Flagged gaps, commonly missed items, and code requirements nobody called out.